“ … Here is another one. A change in what Human nature will allow for government. "Careful, Kryon, don't talk about politics. You'll get in trouble." I won't get in trouble. I'm going to tell you to watch for leadership that cares about you. "You mean politics is going to change?" It already has. It's beginning. Watch for it. You're going to see a total phase-out of old energy dictatorships eventually. The potential is that you're going to see that before 2013.

They're going to fall over, you know, because the energy of the population will not sustain an old energy leader ..."
"Update on Current Events" – Jul 23, 2011 (Kryon channelled by Lee Carroll) - (Subjects: The Humanization of God, Gaia, Shift of Human Consciousness, 2012, Benevolent Design, Financial Institutes (Recession, System to Change ...), Water Cycle (Heat up, Mini Ice Ace, Oceans, Fish, Earthquakes ..), Nuclear Power Revealed, Geothermal Power, Hydro Power, Drinking Water from Seawater, No need for Oil as Much, Middle East in Peace, Persia/Iran Uprising, Muhammad, Israel, DNA, Two Dictators to fall soon, Africa, China, (Old) Souls, Species to go, Whales to Humans, Global Unity,..... etc.)
(Subjects: Who/What is Kryon ?, Egypt Uprising, Iran/Persia Uprising, Peace in Middle East without Israel actively involved, Muhammad, "Conceptual" Youth Revolution, "Conceptual" Managed Business, Internet, Social Media, News Media, Google, Bankers, Global Unity,..... etc.)
.

Thursday, March 18, 2010

Residents benefit from underground river water

Slamet Susanto, The Jakarta Post, Gunung Kidul | Sat, 03/13/2010 12:28 PM

Public Works Minister Djoko Kirmanto has inaugurated the underground river water-pumping project, which is expected to provide clean water for 75,000 residents in Gunungkidul, Yogyakarta.

The project, Bribin II, is located in Sindon, Dadapayu, Semanu, Gunungkidul.

The source of water from the underground river, located 104 meters below the ground, is pumped up to the surface by using microhydro power and later channeled to a reservoir on a hill 250 meters high and then distributed to residents’ homes.

Four pipes are used to pump water to the surface, each at a capacity of 80 liters per minute.

The inauguration ceremony on Thursday was marked by switching on the tap that discharged a flow of water in the national colors of respective Indonesian and German flags, as a symbol of cooperation between the two countries in the water-tapping project.

“Thanks to the cooperation between Indonesian and German experts, now Gunungkidul residents, who used to face water shortage during the dry season, can enjoy clean water from the belly of the earth,” Djoko said.

He added the Bribin II project had undergone through an eight-year process.

Launched 2002, the project was suspended due to the earthquake in 2006.

In 2009, after several trials, the workers were able to draw out underground river water to the surface.

The Bribin II project, which is a joint-venture with the Karlsruhe Institute of Technology in Germany, is the first of such a project in the world which works by drawing underground river water from a depth of 104 meters without using electricity.

Head of the Serayu-Opak River Area Center Bambang Hargono said his office was only responsible for operating the equipment and extract water to the surface.

“Water distribution and operational expenses are the domain of responsibility of the local tap-water company.”

No comments: